Hiroshima Port International Container Terminal
This advanced terminal has the deepest quay in the Chugoku and Shikoku Regions (-14/-7.5 m), and is equipped with 3 gantry cranes and 2 container freight stations. HiDECS (container terminal operation system) provides smooth operation, contributing to further reduction in costs.
Terminal Equipment

Gantry crane

Transfer crane (hybrid type)

Reach stacker
Side lifter

IN/OUT gate

Control center
Terminal Layout
Facilities Outline
- Terminal area
- 114,900m²
- Quay
- 14m quay 330m (1berth)
-7.5m quay 150m (1berth) - Gantry cranes
- 40.6-t hoist x 2 units (Lift height: 48.5m, Outreach: 44.5m)
30.5-t hoist x 1 units (Lift height: 27.0m, Outreach: 23.5m) - Reefer plugs
- 76
- Container storage space
- Approx. 8,000 TEU
Fees
| Classification | Facility | Unit Price | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mooring facilities | Water depth -14m quay | Per ton of total tonnage per mooring
|
|||||||||||||||||||||
| Water depth -7.5m quay |
|
||||||||||||||||||||||
| Cargo handling facilities | Gantry crane | 22,000 yen every 30 minutes | |||||||||||||||||||||
|
Cargo handling area - Container yard - Vanning yard - Hazardous material yard, etc. |
4.17yen per 1m² per day | ||||||||||||||||||||||
| Container freight station | 23.88yen per 1m² per day |